Ivey’s scope of work included repairing the delaminating and spalled concrete at the J-Deflector, the J-Deflector Exit Ramp, repairing portions of the floor, as well pouring all of the walls in the trench. Ivey’s has poured over 15,000 bags of a high strength, heat resistant specialty concrete. Ivey’s work also includes spraying over 300,000 pounds of a Dry-Gunnite Specialty Concrete on the ceiling.