Our design team fully incorporated the embark and debark operations for the Cruise Terminal 1 directly in the Parking garage on the ground floor. The 443,000 sq. ft., three story facility features covered bus parking, simultaneous passenger drop-off and pick up, valet parking, rental car parking, and a remote baggage handling conveyor.

The Ivey’s Design/Build Team included: Finfrock, BEA Architects, Kinley LLC, Allen Engineering, and Susan Hall, ASLA, Landscape Architecture.