Owner: |
|
|
Location: |
|
The Pentagon, Arlington, Virginia |
General Contractor: |
|
Hensel Phelps Construction Company |
Contract Amount: |
|
$7,744,673.00 |
Period of Performance: |
|
January 2009 to February 2011 |
The Pentagon Wedge 5 Renovations for Hensel Phelps Construction Company included the structural and miscellaneous steel engineering, fabrication, and erection. Wedge 4 has five floors and a total of approximately 900,000 square feet.
Ivey’s Construction, Inc. self performed the installation of the structural and miscellaneous steel that comprised of concrete masonry unit blast clips, stairs, bridges, structural infill’s, shaft openings, elevator beams and supports, handrails, lavatory supports, and automatic door supports. Further support activities performed include active participation in structural design, connection design, detailing, fabrication, scheduling, cost estimate pricing, and value engineering.
|
|