VAB Bull Gear Replacement

Owner: |
|
Ederer Services |
Location: |
|
Kennedy Space Center, Florida. |
General Contractor: |
|
|
Contract Amount: |
|
$633,760.00 |
Period of Performance: |
|
January 2004 to February 2005 |
Ivey’s Construction, Inc. was contracted to replace the damaged Bull Gear on the main trolley drum for the 325 Ton Bridge Crane in the VAB. Ivey’s custom designed and built a hoisting system that allowed the six foot diameter Bull Gear to be removed in place without having to lower the entire unit almost 500 feet to the ground. Our rigging system included four 1000 Ton jacks to lift the drum and cable approx. four feet vertically and a gantry crane with a 10,000 capacity tugger attached to the trolley frame to lower the damaged Bull Gear and to raise the new Bull Gear. Performing the work in place saved NASA millions of dollars and months of downtime for the bridge crane.
|
|
|
Home | Company Profile | General Contracting | Steel Erection
Current Projects | Completed Projects | Clients | News | Contact Us
IVEY'S CONSTRUCTION, INC.
4060 N. Courtenay Pkwy., Merritt Island, FL 32953
Phone: 321-453-3812 ~ Fax: 321-459-0398 ~ Send Email
General Contractor, State of Florida
License No. CG CO38685
Copyright
2010© Ivey's Construction, Inc.
All rights reserved.
|
 |