|
|
|
|
Brevard County Detention Center Expansion, Phase Two

Owner: |
|
Brevard County Board of Commissioners |
Location: |
|
Brevard County Detention Center, Cocoa, Fla. |
Construction Manager: |
|
Ivey's Construction, Inc. |
Contract Amount: |
|
$10,933,085.00 |
Period of Performance: |
|
January 2006 to April 2008 |
Ivey’s Scope of Work:
Phase Two included the construction of a 50,000 SF Medical/Mental Health Building. The structure has a partial second floor and was attached to the existing BCDC jail on a site prepared to receive the new facility. The structure is primarily concrete cast in place walls for the exterior and most interior bearing walls. The roof structure consists of steel joists and beams supported by the concrete walls and steel columns. All walls are reinforced to meet Florida Correctional Institution Standards. The exterior finishes include an EIFS finish over the concrete walls. Exterior windows and doors meet current FBC requirements as well as Florida Correctional Institution Standards.
|
|
|
Home | Company Profile | General Contracting | Steel Erection
Current Projects | Completed Projects | Clients | News | Contact Us
IVEY'S CONSTRUCTION, INC.
4060 N. Courtenay Pkwy., Merritt Island, FL 32953
Phone: 321-453-3812 ~ Fax: 321-459-0398 ~ Send Email
General Contractor, State of Florida
License No. CG CO38685
Copyright
2010© Ivey's Construction, Inc.
All rights reserved.
|
 |